Tales of the river bank

| 0 Comments
The new railings and earthworks at the site of the old church have now been opened to the public.

The railings - still in their galvanised grey - have been awaiting installation, and this has now been funded by the Ward Committee. A donation of topsoil has been laid down and graded and opened up as a better footpath.

rails.jpgOur picture shows the new railings looking towards the palace, and shows the new earthworks that have been cleared and seeded.

The St Andrews Trust that is responsible for the site says that the gate at the front will be open to visitors during the day, but kept locked at night to deter unwelcome attention.

Leave a comment

About this Entry

This page contains a single entry by Martin published on June 24, 2008 11:24 AM.

Gala announced was the previous entry in this blog.

Summer job is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Pages

OpenID accepted here Learn more about OpenID